RISK ASSESSMENT

 


Producers name: Francesca Jarvis

Production title: The man in the black clothing

Date of risk assessment: 17.03.23

Hazard

Person who may be harmed

Property who may be damaged

Risk controls already in placed

Risk assessment LOW, MODERATE, HIGH, EXTREME  

Further action required to control

Falling over stones and tree branches

Actors and crew

Equipment

Watch your stepping

Low

 

Electricity

Actors and crew

Equipment that is electrical

Plug in all plugs, tape them and check for liquid

Moderate

All wires are taped

Toys/ decorations falling

Actors

Furniture

Toys/ decorations will be in a secure place

Low

Be careful of all surroundings

Road

Actors and crew

Equipment or vehicles

Look both ways before crossing

Moderate

 

Puddles/ falling into puddles

Actors and crew

Equipment

Watch your stepping

Low

Be aware of surroundings and watch where you are going

 

 I've done this activity because I needed to list the hazards and what might happen. I created this document on a word document and made it into a table as it is easier to create column and sections for the different things that go into the risk assessment. I think this will have an impact on my film because then I know what to do to avoid the hazard.

Comments

Popular posts from this blog

CONTINGENCY PLAN

PRODUCTION SCHEDULE